The transport rack was delivered to the construction site by rail or truck. There, the racks were slipped onto rails and rolled to the tower crane. The crane removed the slabs from the rack and distributed them on the construction site.
Ideal supplement for Busch no. 1925 WBS 70 Prefabricated building under construction. Kit.